FACILITY WASTE ACCEPTANCE CRITERIA

FACILITY WASTE ACCEPTANCE CRITERIA

 

• TURYAM RECYCLING Plant accepts the wastes of the companies it works with for the safe and sustainable waste management by appointment system. The date on which the shipment of the waste is planned should be notified to TURYAM RECYCLING plant authority at least 2 days in advance and approval should be obtained about the suitability of the facility.
• The waste manufacturer has to check whether the waste is included in the waste codes attached to the Environmental Permit and License before submitting the waste and only to ship within these codes.
• Waste Producer is obliged to declare the information about the contents of the wastes to be sent to TURYAM RECYCLING Facility and the analysis reports, if any. The signs that the delivered wastes have to bear in accordance with the relevant legislation must be kept in their correct and complete labels.
• Waste packaging should be detailed in advance before shipment to the facility in order to ensure correct vehicle organization. (Pallet, barrel number, cast etc.)
• It should be ensured that no wastes (radioactive, medical waste, etc.) that cannot be accepted to the facility within the wastes sent are not present.
• In waste loading; bucket, forklift operation belongs to Waste Manufacturer. When the vehicle enters the factory site, the loading process must be completed and the documents must be delivered as soon as possible.
• National Waste Transportation forms must be completed in accordance with the declared waste code. The UAT form, delivery note and scale slip must be delivered to the licensed vehicle driver.
• The transportation license of the waste vehicle coming to our facility, then the driver’s license and the conformity of the document are checked,
• After this control, the waste information provided by the waste information provided in the UAT form is checked by the eye and then in the laboratory environment.